Reed Machinery &
Transportation, Inc.
Job Site Photos
The following photos were taken on job sites of projects that have been  completed.  
They show you some of the capabilities of Reed Machinery.
Fox Metro Sanitary District:  Installation
of custom filtration system.  Filtration pit
prepared prior to start of project.
Filtration bridge staged for installation
on filter pits wall and track.
Bridge set in location to travel length of pit
and remove solid waste from filtration pit.
Filtration pit completed and online for
production.
World's largest MRI 9.4 tesla 110,00 lbs.
238,000 lbs. Clamp unit of injection
molding machine.
MRI in third story window
Chiller going in basement at ECC
basement
Installation of switch gears and CAT
Generator at Provena Mercy in Aurora